ru

Выбрать язык

Измените язык сайта на более удобный.

Change the language of the site to a more convenient one.

将网站的语言更改为更方便的语言。

Ferzikovo Project

Ferzikovo Project

Russia

Industrial and Infrastructure Construction

The unique Borshchevskoye raw material deposit supplies the plant with high-purity limestones and clays with optimal composition; modern technical means ensure stability of the chemical and phase composition of the raw mix and clinker.

About the project

The volume of investments in the construction of the new plant, considering the creation of adjacent infrastructure in Ferzikovskiy district, amounted to 500 million euros.

In 2015, an alternative fuel workshop was put into operation at the plant - a unique production facility for environmentally friendly and safe processing of solid municipal waste. Investments in the construction of the alternative fuel workshop amounted to 240 million rubles.

The share of thermal energy spent in the production of cement is 30% of its production cost. The use of waste as an alternative fuel allows to reduce the area of ​​landfills and the negative impact they have on the environment.

Подписаться

Подпишитесь на нашу рассылку вакансий

Смотрите также

Olefin Complex EP-600 Project & Styrene Chain Project (NKNKh)

12/11/2024

Amur Gas Chemical Complex

12/10/2024

Amur Gas Processing Plant

12/11/2024

Отзыв клиента

Мы стремимся к тому, чтобы каждый опыт сотрудничества приносил реальную ценность и вдохновлял на новые достижения.

Все отзывы

LafargeHolcim

Мы остались полностью довольны профессиональным уровнем услуг, предоставленных компанией МПШ Восток. В связи с этим мы с уверенностью рекомендуем компанию МПШ Восток как надежного поставщика кадровых ресурсов и выражаем надежду на дальнейшее сотрудничество с ними в наших будущих проектах.

читать полностью
Иоана Бирта
Иоана Бирта

Административный менеджер