YAMAL LNG
YAMAL LNG is an integrated project for the production, liquefaction and supply of natural gas.
The project envisages the construction of a liquefied natural gas (LNG) plant with a capacity of about 16.5 million tons per year based on the resource base of the South Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. The design production level is about 27 billion cubic meters of gas per year for at least 20 years.
As part of the Project, a transport infrastructure has been created, including a seaport and the Sabetta airport.
The Yamal LNG operator is a joint venture of NOVATEK with a 50.1% stake, Total - 20%, CNPC (China National Petroleum Corporation) -20% and the Silk Road Fund (9.9%).
The final investment decision (FID) was made in December 2013.
The construction of the natural gas liquefaction plant was carried out in three stages with launches in 2017, 2018 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate with delivery to the markets of the Asia-Pacific region and Europe.
Yamal LNG OJSC is the operator of the liquefied natural gas (LNG) plant on the resource base of the South Tambeyskoye field with a capacity of 17.4 million tons per year, including three trains with a capacity of 5.5 million tons per year each and one line with a capacity of 900 thousand tons per year.
The hydrocarbon mixture from the wells is fed to a single integrated complex for the preparation and liquefaction of natural gas.
At the inlet facilities of the complex, separation occurs, i.e. separation of mechanical impurities, water, methanol and gas condensate from the gas.
The inlet facilities include methanol regeneration and gas condensate stabilization units.
The purified gas then goes to pre-cooling and liquefaction.
A propane refrigeration circuit is used for pre-cooling the gas, and a circuit with a mixed refrigerant is used for liquefaction.
The finished LNG is supplied for storage in cryogenic tanks.
Transportation of liquefied natural gas (LNG) within the framework of the Yamal LNG project is carried out using special ice-class ARC7 tankers. They allow year-round navigation without icebreaker assistance in the westerly direction through the Kara Sea and during summer navigation - in the eastern direction along the Northern Sea Route.
The ARC7 class of vessels assumes their independent navigation in compact first-year Arctic ice up to 1.4 m thick in the winter-spring and up to 1.7 m thick in the summer-autumn navigation periods, as well as following an icebreaker in first-year Arctic ice up to 2.0 m thick in the winter-spring and up to 3.2 m thick in the summer-autumn navigation periods.
Contact us to find out about current job openings on the project!
Projects
-
Solar Energy Projects
MPH Vostok cooperates with several companies in the field of solar generation, one of...
-
Sakhalin-2
Sakhalin-2 is a project to develop the Piltun-Astokhskoye oil and Lunskoye gas condensate...
-
Gold Mining Industry
Projects in the gold mining industry are implemented by our Client - the largest investor...
-
ZapSibNeftekhim
ZapSibNeftekhim is a Tobolsk enterprise of SIBUR, the largest petrochemical complex...
-
Olefin Complex EP-600 Project & Styrene Chain Project (NKNKh)
Nizhnekamskneftekhim PJSC is one of SIBUR's largest production sites for synthetic rubbers...
-
Subsea Technologies and Repair - Center of Excellence
Effective integrity management of offshore gas transportation infrastructure is essential...
-
YAMAL LNG
YAMAL LNG is an integrated project for the production, liquefaction and supply of natural...
-
Taishet Anode Factory
Taishet Anode Factory (TAF) is one of RUSAL's two largest investment projects in the...
-
Salym Oil Fields Development Project
The Salym project is a complex of works on additional exploration and development of...
-
Ferzikovo Project
Ferzikovo cement plant in Kaluga region was launched in 2014. The unique Borshchevskoye...
-
VOLGA Project
The Volsky Plant (1897) is not only one of the largest plants in the Russian cement...
-
KOS – Kazanorgsintez
Kazanorgsintez PJSC is one of the leading enterprises of the chemical industry of...
-
RusVinyl
RusVinyl LLC is a polyvinyl chloride (PVC) manufacturing company in the Kstovsky District...
-
NPP Rooppur
The first NPP in Bangladesh, Rooppur, with two VVER-1200 reactors with a total capacity...
-
El Dabaa NPP
El Dabaa NPP is the first nuclear power plant in Egypt, which will be built in the...
-
Paks-2 NPP Construction Project
The Paks-2 NPP construction project is being implemented on the basis of the Russian-Hungarian...
-
Arctic LNG 2
Arctic LNG 2 is a project of Novatek for the extraction of natural gas and the production...
-
Baltic Project
The Baltic Project is a project for a large complex for processing ethane-containing...
-
Amur Gas Chemical Complex
The Amur Gas Chemical Complex (GCC) is one of SIBUR's priority projects. It is a joint...
-
Amur Gas Processing Plant
The investor and customer of the Amur GPP construction project is Gazprom Pererabotka...
-
Baimskaya Copper Project
The Baimskaya copper-porphyry area is located in the Bilibinsky district of the Chukotka...
-
Turkish Stream
Turkstream is a main export gas pipeline from Russia to Turkey across the Black Sea....
-
KHARYAGA
Type of Project: Oil Onshore Project The Kharyaga oilfield lies 60 kilometres...